Residential Interior Refurbishment : Lynn Rd Completed Stage 2

Scope of works

Complete refurbishment of hallway, bedrooms, bathroom and toilet including; Strip out back to framing for bathroom/toilet and combining them into 1 large room,  remove and dispose of all floor coverings,  replace all interior doors, fit under floor heating, floor to ceiling tiles in bathroom allowing for new level entry walk in shower, new double glazed joinery, new wardrobe slider doors, plastering and painting throughout.

Date of works: Jun – Aug 2018

Obstacles faced along the way

Working in with clients to arrange moving out of their home to along for bedroom renovations: Outlining programme and dates for clients ahead of starting the project to establish a clear outline of work and timelines where clients needed to be out of the house. Having worked with these clients previously renovating the other half of the house a solid foundation of trust had been established leaving them with no hesitation to hand over the keys to their home for the duration of the project.

Clients being over seas for part of the renovation: Outlining clear requirements and gathering details prior to leaving. Using email to keep owners in the loop. Whilst they were away there was a fault with a shower mixer that had been supplied by the owners; despite this not being from one of our suppliers we went above and beyond to track down the supplier and work with them to resolve the fault with them at no extra cost and minimal stress to our client who were enjoying a holiday away.